What it is
Moisture moving up through a slab is one of the most common reasons coatings blister and flooring adhesives let go. We test first, then install a moisture-mitigation system when the numbers call for it, so your finished floor has a sound base.
Mitigation systems are typically high-solids epoxy membranes rated for high relative humidity, applied to a mechanically profiled slab before the coating or flooring goes on.

Where it's used
- Slabs on grade without an effective vapor retarder
- New slabs on tight schedules
- Basements and below-grade spaces
- Renovations with failed flooring or coatings
- Prep for resilient flooring, wood, or coatings
Our process
- Test: in-situ RH probes (ASTM F2170) and/or calcium chloride (ASTM F1869).
- Review results against the flooring or coating manufacturer's limits.
- Grind or shot blast to the required profile.
- Repair cracks and treat joints.
- Apply mitigation membrane, then primer or the next system.
Typical timeline
RH testing needs probes to sit in the slab before reading, usually at least a day. Mitigation membranes typically add a day to the install, depending on the product and cure. Testing early in the schedule gives the most options.
Maintenance
A mitigation membrane sits under the finished floor and needs no maintenance itself. Keep up with the maintenance on the finished floor above it.
FAQ
Do we really need to test?
If a coating or flooring warranty depends on moisture limits, yes. Testing is cheap compared to tearing out a failed floor.
Can polished concrete handle moisture?
Polished concrete has no film to blister, so it's often a good option on slabs with moisture issues. We'll talk through options.
Can mitigation go under other flooring?
Yes. Many systems are rated for use under resilient flooring, carpet, and wood, as well as coatings. We confirm compatibility with the flooring manufacturer.